Valve and header for returns
3 Mag 9.5's return into a common return header with independent
shutoff valves enabling individual pump maintenance.
(system can run on any single pump by closing off the
valves for the other 2).
an additional valve leads to a pipe up through the attic to the
laundry room where 55 gallon plastic drums are used to collect
R/O water and mix and aerate new salt mix for fast, bucket-less
water changes.
(we turn three valves, and pump out 30 gallons to the laundry room
washing machine drain and then throw 2 control valves in the
laundry room to pump back in 30 gallons of new salt mix every weekend).
total time to do a weekly water change: 10 minutes. and NO BUCKETS. B)
Recommended Comments
There are no comments to display.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.